Kategori
No. | Keterangan | Tahun | No. Kontrak | Periode | Harga Kontrak | Catatan |
---|---|---|---|---|---|---|
11 | The Construction of Housing Type G.2 and G.6 at Kebun Sumber Sawit Desa Balian Kec. Mesuji Raya Kab. OKI Prov. Sumatera Selatan | 2010 | 045/MBJ/SPK/IV/2010, tanggal 8 April 2010 | 365 hari | Rp. 5.766.000.000,- | PT. Gunung Tua Abadi |
12 | The Construction of 50 Units Double Dwellings at Tulung Gelam Estate Cengal Location South Sumatra | 2009 | 101/INP/LOI/X/2009, tanggal 16 Nopember 2009 | 2 tahun | Rp. 8.181.026.549,- | PT. PP. London Sumatra Indonesia Tbk |
13 | The Construction of 50 Units Double Dwellings at Bebah Permata Estate Cengal Location South Sumatra | 2009 | 102/INP/LOI/X/2009, Tanggal 16 Nopember 2009 | 2 tahun | Rp. 7.746.554.547,- | PT. PP. London Sumatra Indonesia Tbk |
14 | Well site and Access Road and Cleanup Post Drilling Services Sriwijaya 4 | 2009 | TEP-002-2009, tanggal | 60 hari | US$ 331,267.42 | PT. Tropik Energi Pandan |
15 | Well site and Access Road and Construction Services Sriwijaya -3 | 2009 | TEP-001-2009, tanggal | 42 hari | US$ 327,836.09 | PT. Tropik Energi Pandan |
16 | Upgrading Work of Main Road Street, Main Gate to Town Site and Mill Site-Project | 2009 | 036/CAD/PSP/TEL/ SITE/XII/2009 | 90 hari | Rp. 2.245.182.370,- | PT. Tanjung Enim Lestari Pulp & Paper |
17 | Well site and Access Road Construction Services Sriwijaya-2,3 and Ario Damar 1 | 2009 | TEP-005-2009, tanggal 09 Juli 2009 | 180 hari | US$ 980.000,- | PT. Tropik Energi Pandan |
18 | The Construction of Water Park Ogan Permata Indah at Jakabaring Palembang | 2009 | 001/SK-OPI/III/2009, Tanggal 06 Maret 2009 | 18 bulan | Rp. 36.000.000.000,- | PT. Ogan Permata Indah |
19 | The Construction of 28 Unit Double Dwelling at Sei Kepayang Estate, South Sumatra | 2009 | 57/INP/LoI/VII/2009, tanggal 01 Agustus 2009 | 60 hari | Rp. 4.409.401.593,- | PT. PP. London Sumatra Indonesia Tbk |
20 | The Construction of 28 Unit Double Dwelling at Arta Kencana Pom, South Sumatra | 2009 | 61/INP/LoI/VII/2009, tanggal 01 Agustus, 2009 | 60 hari | Rp. 486.026.423,- | PT. PP. London Sumatra Indonesia Tbk |