Pengalaman Kerja

Kategori 

No. Keterangan Tahun No. Kontrak Periode Harga Kontrak Catatan
21 The Construction of 28 Unit Double Dwelling and 1 unit Assistant House at Cengal Estate, South Sumatra 2009 103/INP/LOI/X/2009, tanggal 16 Nopember 2009 2010 hari Rp. 2.872.418.904,- PT. PP. London Sumatra Indonesia Tbk
22 The Construction of 3 Unit Workshop at Kencana Sari Estate, Kubu Pakaran and Sei Kepayang, South Sumatra 2009 114/INP/LOI/X/2009, tanggal 9 Desember 2009 210 hari Rp. 1.117.785.000,- PT. PP. London Sumatra Indonesia Tbk
23 The Construction of 7 Unit Double Dwelling at Arta Kencana Estate, South Sumatra 2009 60/INP/LOI/VII/2009 01 Agustus 2009 60 hari Rp. 1.133.245.550,- PT. PP. London Sumatra Indonesia Tbk
24 Services Road Improvement Work From main gate To Fly Over 2009 129363, tanggal 30 December 2009 180 hari Rp. 2.245.182.370,- PT. Tanjungenim Lestari Pulp and Paper
25 Services Road Improvement Work From main gate To Fly Over 2009 129363, tanggal 29 Desember 2009 90 hari RP. 2.469.700.607,- PT. Tanjung Enim Lestari
26 Pembangunan Pintu Air, Box Culvert dan Titi Panen 2009 069/SPK/MUKUT/XII/2009, tanggal 7 Desember 2009 120 hari Rp. 5.805.291.000,- PT. Hindoli
27 Construction and Installation Services for 10" Pipeline from BGP to CPS 2009 Sp-21144-002-XI-09, tanggal 4 Nopember 2009 120 hari US $ 2.288.000 PT. Meindo Elang Indah
28 Replacement Pump-Chemical Injection Pump in UTL-Prod. First Refinery UP. III Plaju 2009 232/E13000/2009-SO 90 hari Rp. 595.100.000,- & US$ 375.000,- PT. Pertamina UP III Plaju
29 Pengadaan Pipa PVC RR S-12,5 dia. 700 MM = 4.698 M' dan Pipa PVC RR S-12.5 dia. 500 MM = 3.498 M' di lokasi kota Palembang 2009 05/PKK/PKPAM-SS/V/2009, tanggal 22 Mei 2009 90 hari Rp. 27.196.400.000,- P3P Sumatera Selatan
30 Clearing to ROW Pipeline and Flowline 2008 SGA-L-ISJK-001, tanggal 11 Maret 2008 90 hari Rp. 3.344.000.000,- PT. IKPT